Construction of the College Branch Building (Boys) at the Secondary Industrial Institute in Qatif with a total area of (2109 m2) and 3 floors.
It also includes public site works and parking lots with a total area of (6081 m2). This includes providing materials, equipment, workers and all things necessary to implement, complete and maintain the works. specified in the contract.